MAIN JOP SCOPE TO DO MACHINE REPAIR AND RECONSTRUCTION
• PREVENTIVE MAINTENANCE MACHINE (PM)• CNC MACHINE OVERHAUL REPAIR HYDRULIC SYSTEM REPAIR AND RECONSTRUCTION
• MOVE MACHINE
PREVENTIVE MAINTENANCE MACHINE (PM)
• Objectives.1. Check accuracy machine. (X,Y,Z,A,B and table)
2. Check lubrication systems.
3. Check oil gear.
4. Check electrics systems.
5. The Problems result with machine.
6. Cleaning machine.
• Report
1. Check Sheet (Functional Test).
2. The Problems result with machine.
3. Static accuracy measurement report.
3.1 Before → After
3.2 Backlash measurement report.
4. Cleaning & Inspection machine.
1. Check Sheet (Functional Test).
2. The Problems result with machine.
3. Static accuracy measurement report.
3.1 Before
3. Static accuracy measurement report.
3.1 After
3. Static accuracy measurement report.
3.2 Backlash measurement report
4. Statement of clarification
CNC MACHINE OVERHAUL REPAIR
HYDRULIC SYSTEM REPAIR AND RECONSTRUCTION
MOVE MACHINE
Job Scope 6 Step
1.Back up parameter and program.
2.Check data accuracy before move machine.
3.Move machine
4.Check data accuracy.
1. Back up parameter and program.
2. Check data accuracy before move machine.
3. Move machine
4. Check data accuracy.
5. Adjust data accuracy after move machine.
6. Test run.
2. Check data accuracy before move machine.
3. Move machine
4. Check data accuracy.
5. Adjust data accuracy after move machine.
6. Test run.
1.Back up parameter and program.
2.Check data accuracy before move machine.
3.Move machine
4.Check data accuracy.
5.Adjust data accuracy after move machine.
6.Test run.